Home > Projects > BOT Projects
 
 
BOT Projects
 
114 km Seoni-Balaghat-Rajegaon State Highway on SH – 26 and SH – 11
 
The Company has successfully completed the execution of the BOT project of 114 km Seoni-Balaghat-Rajegaon State Highway on SH – 26 and SH – 11 which are important constituent of the main trunk route network of Madhya Pradesh. The Project Road falls in two districts of Madhya Pradesh viz. Seoni (about 45 kms) & Balaghat (about 69 kms) and it is very important link road connecting NH – 7 at Seoni (Madhya Pradesh) and NH – 6 at Duggipur (near Gondia, Maharashtra). It serves as an important link for transportation of various minerals, agriculture and forest products and various other commodities. It provides shortest link for the traffic coming via NH – 7 from North-West part of the state and the country as a whole and moving towards State of Chhattisgarh, Orissa & West Bengal and vice-versa.
 
 
Development of Seoni-Katangi to Maharashtra Border Section of State Highway-54 of Madhya Pradesh

The Company has been awarded the project for developing the Seoni-Katangi to Maharashtra Border Section of State Highway-54 of Madhya Pradesh on BOT (toll) basis by Madhya Pradesh Road Development Corporation Ltd (MPRDC). The estimated cost of the project is Rs. 212 crores. The concession period is 30 years and MPRDC will contribute non-refundable grant/subsidy of Rs. 59.85 Crores. The length of the project highway is 75.60 km and the construction period is 730 days. The project will be executed through a 100% owned subsidiary. The Project Road is in Seoni and Balaghat districts of Madhya Pradesh and passes through important towns of Seoni, Ari, Tighra, Kehaji, Paraswada and Katangi. The project road is used for transportation of manganese, coal and other minerals extracted in the nearby mines; items like Bamboo, herbs, teak, sal etc. from nearby forests; and agricultural products amongst others. The road is also used by tourists visiting nearby attractions like Pench National Park or Kanha National Park.
 
The Project will be executed through a 100% owned subsidiary - MBL Highway Development Company Limited.
 
Strengthening, Widening, Maintaining and Operating of Waraseoni-Lalbarra Road of Madhya Pradesh on BOT (Toll + Annuity) Basis 
 
The Company has been awarded the project for Strengthening, Widening, Maintaining and Operating of Waraseoni-Lalbarra Road of Madhya Pradesh on BOT (Toll + Annuity) Basis by Madhya Pradesh Road Development Corporation Limited (MPRDC). The concession period is 15 years. MPRDC will contribute annuity of Rs. 84.76 Crores (Rs. 3.26 Crores Semi-annual). Besides this, MBL shall also have the right to collect Toll. The total length of the Project Highway is 18.303 Kms and the construction period is 730 Days. The Project will be executed through a 100% owned subsidiary - MBL (MP) Toll Road Company Limited.   
 

Developing and Operation of Bikaner - Suratgarh Section of NH -15 in the State of Rajasthan on DBFOT Basis

The Company has been awarded the project for Developing and Operation of Bikaner - Suratgarh Section of NH-15 in the State of Rajasthan. The Project is to be executed on DBFOT Basis with a concession period of 16 years (including construction period of 24 months). The Project is for two laing with paved shoulder of Bikaner - Suratgarh Section of NH - 15 (Km 553/869 of NH - 11 to Km 173/000 of NH - 15 via Km 10/630 of NH - 15) in the State of Rajasthan. The Project has been awarded to the consortium led by MBL Infra, other partner being SREI Infra. The Total Project cost of exceeding Rs. 500 Crores.

 

Construction of Garra-Waraseoni - upto Maharashtra Border 46.98 km road for MPRDC on Annuity + Toll Basis